KGJ Price Rail Ltd were awarded a package of works to supply all the labour, plant and materials to undertake all the Civils and P-Way works on Nether Poppleton Area Re-Signalling project which including the Upgrade of Nether Poppleton Level Crossing from Automatic Half Barrier (AHB) to Manually Controlled Barriers Supervised by Obstacle Detector (MCB-OD2).

The work comprised of the following:

  • Design & Installation of 2 New Insulated Rail Joints (IRJ’s)
  • Design & Installation of 2 x Steel Hollow Sleepers
  • Installation of 4 New Timber Sleepers for Positioning of AWS Magnets
  • Installation of 2 New Piled Signal Foundations, Signal Laydown Areas and SPT Drivers Walkways (including Retaining Walls and GRP Handrail)
  • Upgrade of 804mtrs of C/1/9 Cable Route to Series 200 TTS Cable Route (including Vegetation Clearance)
  • Refurbishment of 1609mtrs of existing C/1/9 Cable Route (including Vegetation Clearance)
  • Construction of New REB, MEH and DNO Foundation (including Cable Routes, Turning Chamber, Walkways and Hardstanding Areas, 55mtrs of Palisade Fencing and 15mtrs of Touchsafe Palisade Fencing around the DNO)
  • Construction of a New 29mtr Under Road Crossing (URX) including 2 x Turning Chambers
  • Construction of 4 New Barrier Pedestal Foundations and Installation of 4 New Buried Road Traffic Light (PRTL/ RTLS) Posts
  • Level Crossing Deck (Polysafe) Extension and Installation of all New Rubber Anti-Trespass Guards
  • Piled Foundations for and Installation of the New OD Posts for the New OD2 Scanners
  • Installation of LCU/ CCU Foundations and Public Telephone Foundations
  • Recovery of Old Palisade Fencing & Gates and Installation of New Roll Top Fencing & Gates
  • New Footpath Construction including New Kerbs/ Drop Kerbs, Footpath Edgings, Tactiles and Surfacing
  • Removal of Existing Line Marking, Installation of New Line Marking including Cycle Markings/ Paths and Yellow Box Hatching and Installation of 25 New Bi-Directional Road Studs (Cats Eyes)
  • Installation of New Highways Posts & Signage, Level Crossing Posts & Signage and Lineside Speed Board Posts and Signage
  • Recovery of Existing REB and all Existing Level Crossing Equipment
  • Recovery of Existing Enforcement Cameras

 