KGJ Price Rail Ltd were awarded a package of works to supply all the labour, plant and materials to undertake all the Civils and P-Way works on Nether Poppleton Area Re-Signalling project which including the Upgrade of Nether Poppleton Level Crossing from Automatic Half Barrier (AHB) to Manually Controlled Barriers Supervised by Obstacle Detector (MCB-OD2).
The work comprised of the following:
- Design & Installation of 2 New Insulated Rail Joints (IRJ’s)
- Design & Installation of 2 x Steel Hollow Sleepers
- Installation of 4 New Timber Sleepers for Positioning of AWS Magnets
- Installation of 2 New Piled Signal Foundations, Signal Laydown Areas and SPT Drivers Walkways (including Retaining Walls and GRP Handrail)
- Upgrade of 804mtrs of C/1/9 Cable Route to Series 200 TTS Cable Route (including Vegetation Clearance)
- Refurbishment of 1609mtrs of existing C/1/9 Cable Route (including Vegetation Clearance)
- Construction of New REB, MEH and DNO Foundation (including Cable Routes, Turning Chamber, Walkways and Hardstanding Areas, 55mtrs of Palisade Fencing and 15mtrs of Touchsafe Palisade Fencing around the DNO)
- Construction of a New 29mtr Under Road Crossing (URX) including 2 x Turning Chambers
- Construction of 4 New Barrier Pedestal Foundations and Installation of 4 New Buried Road Traffic Light (PRTL/ RTLS) Posts
- Level Crossing Deck (Polysafe) Extension and Installation of all New Rubber Anti-Trespass Guards
- Piled Foundations for and Installation of the New OD Posts for the New OD2 Scanners
- Installation of LCU/ CCU Foundations and Public Telephone Foundations
- Recovery of Old Palisade Fencing & Gates and Installation of New Roll Top Fencing & Gates
- New Footpath Construction including New Kerbs/ Drop Kerbs, Footpath Edgings, Tactiles and Surfacing
- Removal of Existing Line Marking, Installation of New Line Marking including Cycle Markings/ Paths and Yellow Box Hatching and Installation of 25 New Bi-Directional Road Studs (Cats Eyes)
- Installation of New Highways Posts & Signage, Level Crossing Posts & Signage and Lineside Speed Board Posts and Signage
- Recovery of Existing REB and all Existing Level Crossing Equipment
- Recovery of Existing Enforcement Cameras
Ask Us Anything. Anytime.
For more details about our projects and capabilities please don’t hesitate to get in touch with us.
- KGJ Price Rail Limited, Unit 1A, Kellingley Road, Weeland Park, Knottingley, WF11 8DS
- railenquiries@kgjpricerail.co.uk
- 0333 7722421