Case Study

TILL LEVEL CROSSING PROJECT

July 2020 – December 2020 | Tram Inn, Landovery and Llandrindod Wells

KGJ Price were contracted to provide Permanent Way Design and installation for 10 x Hollow Sleepers and 4x Pairs of IRJ’s. KGJP were then also instructed to complete the required Level Crossing deck extensions at Tram Inn and Llandrindod.

Details:

Tram Inn:

 

  • Survey, Design and Installation of 2x Pairs of IRJ’s.
  • Installation of 2x Pairs of 4 Hole Dry IRJ’s.
  • Survey, Design and Installation of 4x Hollow Sleepers.
  • Installation of Twin Track Polysafe Deck Extensions.
  • Track CRE, Track Monitoring and CRT Management.

 

Llandovery:

  • Survey, Design and Installation of 4x Hollow Sleepers.
  • Twin Track GRP Anti-Trespass.
  • Track CRE, Track Monitoring and CRT Management.

 

 

Llandrindod Wells:

 

  • Survey, Design and Installation of 2x Hollow Sleepers.
  • Installation of Single Track Polysafe Deck Extensions.
  • Single Track GRP Anti-Trespass.
  • Track CRE, Track Monitoring and CRT Management.

 

PROGRAMME & DELIVERY TRAM INN:

  • 1 x 27hr Core Works Shifts
  • 2 x 8hr Shifts

 

PROGRAMME & DELIVERY LLANDOVERY:

  • 3 x 8hr Shifts

 

PROGRAMME & DELIVERY LLANDRINDOD WELLS:

  • 3 x 8hr Shifts