Case Study

WESTBURY IEP (INTERCITY EXP. PROG.)

Dec 2018 – Jan 2019 | Westbury

Client

S&C (South Alliance)(MECX)

As part of the Intercity Express Programme (IEP), the track alignment needed to be modified at the entrance & through the station at Westbury. Platform 2 & 3 required coper re-alignment as well as further platform drainage & improvements.

Details:

KGJ Price undertook all platform works/modifications (MECX lead Sub-Contractor) to suit the revised track position as well as further platform improvement works. The full detailed scope is as detailed below.

THE WORKS INCLUDED:-

  • Remove existing platform copers, re-install to design position & levels (160m).
  • Remove existing platform tactiles, re-install to design position & levels (180m).
  • Remove existing tarmac & re-surfacing (circa 300m2).
  • Remove existing trough & replace (circa 300m).
  • Install 3 x Signal bases including drop-down plinths.
  • Install platform drainage & chambers (circa 150m).

Ask Us Anything. Anytime.